This is a simulation guide for the Thermal Bank in Arknights: Endfield. It covers how to clear the Thermal Bank simulation, bonus goals, and rewards for clearing in AKEF.
Table of Contents title here
Thermal Bank Overview
Thermal Bank Objectives
| Main Objective | - Use Thermal banks to generate power for the AIC - Bring the production line back online and produce LC Valley Batteries |
|---|---|
| Bonus Goal | Place more Thermal Banks to increase total power grid output. |
| Rewards | - Oroberyl x25 Thermal Bank Blueprint - Operational EXP x100 |
| Bonus Goal Rewards | Oroberyl x15 |
Thermal Bank Simulation Chart
Transport from PAC Output Port 3 to the Thermal Bank

First, set "Originium Ore" as the transport material for PAC Output Port 3. Then, use a Transport Belt to deliver the Originium Ore to the Thermal Bank.
Install 1 Additional Thermal Bank

Next, install one additional Thermal Bank. Choose a location where it's easy to extend a Transport Belt from the PAC Output Port.
Transport from the PAC Output Port to Thermal Bank

Set the PAC Output Port’s transport material to "Originium Ore" and transport it to the newly installed Thermal Bank.
Repeat Steps 2–3 Until Required Power is Reached

Repeat steps 2 and 3 (installing a Thermal Bank and transporting Originium Ore) until you reach the power required to operate the Logistics Connections for the main objective.
Thermal Bank Bonus Goal
Transport LC Valley Batteries to the Thermal Bank

Put LC Valley Batteries from the PAC Output Port into the Thermal Bank to increase power generation.
Add More Thermal Banks and LC Valley Batteries

To complete the bonus objective, you must increase the total power generation to 650. Add more Thermal Banks and LC Valley Batteries to reach the required power output.
Related Arknights: Endfield Articles
Back to Top PageValley IV Simulations
| Electric Mining Rig | Material Production | Logistics Connections |
| Shredding Unit | Belt-free Transfer | Meds Production |
| Moulding Unit | Fitting Unit | Gearing Unit |
| Industrial Explosive | Thermal Bank | Planting Unit and Seed-Pickikng Unit |
| Splitter | Depot Bus | Belt Bridge |
| Depot Bus Integration | Electric Mining Rig II | Converger |
| Grinding Unit | Improved Cannery | SC Valley Battery |
| Buck Capsule [A] | Transport Belt | Filling Unit |
Wuling Simulations
| Pipes and Fluids | Reactor Crucible | Filling Unit (Fluid) |
| Planting Unit and Pipe Splitter | Sprinkler | Pipe Logistics |
| Reactor Expansion | Forge of the Sky | Separating Unit |